[1]
Notoatmodjo, B. and Handoko, J. 2024. DELAY RED FLAG CONSTRUCTION COMPANY: CONTROL ANALYSIS WITH FOUR LEVER OF CONTROL. Riset: Jurnal Aplikasi Ekonomi Akuntansi dan Bisnis. 6, 2 (Sep. 2024), 102 - 116. DOI:https://doi.org/10.37641/riset.v6i2.2118.