Notoatmodjo, B., & Handoko, J. (2024). DELAY RED FLAG CONSTRUCTION COMPANY: CONTROL ANALYSIS WITH FOUR LEVER OF CONTROL. Riset: Jurnal Aplikasi Ekonomi Akuntansi Dan Bisnis, 6(2), 102 - 116. https://doi.org/10.37641/riset.v6i2.2118